AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |
Back to Blog
Cedar city airport closing10/27/2023 ![]() ![]() Even though crews had removed 5 feet of clay and replaced it with structural fill before building the original runway, later analysis revealed that moisture-filled clay still posed a problem. ![]() The culprit was the clay, which expands when it gets wet. “Some areas on the side of the runway swelled more than 12 inches, which is pretty significant heaving,” says Stehmeier. The villain and hero was blue clay, which is common in southwestern Utah, where SGU is located.Īirport Manager Rich Stehmeier notes that the pavement issue first arose several years after SGU opened in January 2011. Ironically, the $26 million project that reconstructed the 9,300-foot runway leveraged the same material that caused the runway to start heaving in the first place. But its routine appearance belies what’s hidden below: a clever feat of engineering and earthwork designed to stop the pavement heaving that doomed the original runway. George Regional Airport (SGU) doesn’t look at all unusual. Reduced Rate.The newly rebuilt runway at St. $40 suggested Caddie fee per bag & $30 recommended gratuity per bag.Ĭallaway rental clubs are available for $80, including two sleeves of Callaway Chrome Soft golf balls.Īpril 5 – 16: Aeration Recovery. March 10 – April 16 & October 30 – December 3Įnjoy Complimentary On-course Snacks With Your Round.īook your forecaddie by contacting our Caddie Manager at Cash payment only. Rates include golf cart, driving range balls, and bottled water on the course.
0 Comments
Read More
Leave a Reply. |